Home Services Grey Structure Construction in Etihad Town Lahore

Grey Structure Construction in Etihad Town Lahore

Foundation, RCC Frame, Brick Masonry, Roof Slab, Boundary Wall, BOQ-fixed price across all Etihad Town phases & sectors.

Get Free Estimate +92 324 4074549
From PKR 3,250Grey Structure /sqft
B-25Minimum Concrete
Fixed PriceBOQ Contract
9-12 Months10 Marla (G+1)
Quick Answer

What is included in grey structure?

Soil testing, RCC foundation, complete RCC frame, brick masonry, plaster, staircase, roof slab, roof waterproofing, boundary wall with gate pillars, and building-map drawings. It does not include flooring, tiles, paint, kitchen, bathrooms, doors, windows, electrical or plumbing fittings.

Full Scope

Grey Structure, What Etihad Builders Delivers

Grey structure is the complete structural shell of your home, from soil testing to the finished roof slab. At Etihad Builders every specification is written into the BOQ before you sign: every material named by brand and grade, concrete cube tests at each pour, and reinforcement photographed before concreting.

Included in Every Grey Structure Contract

  • Soil investigation, bearing-capacity test before design
  • RCC foundation, raft or strip footing, B-25 concrete, Grade 60 steel
  • RCC frame, columns, beams and slabs with cube tests at every pour
  • Brick masonry, 9-inch external, 4.5-inch internal walls
  • Plaster, internal sand-cement, external waterproof admixture
  • Staircase & roof slab, RCC, with parapet walls
  • Roof waterproofing, bituminous membrane, standard
  • Boundary wall, full height, plastered, with gate pillars
  • Building-map drawings & approval, included

Construction Costs in Etihad Town Lahore, 2025

Plot SizeGrey StructureTurnkey StandardTurnkey LuxuryTimeline
5 MarlaPKR 58-68LPKR 95L-1.15CrPKR 1.15-1.40Cr6-9 months
7 MarlaPKR 82-95LPKR 1.30-1.50CrPKR 1.60-1.85Cr7-10 months
10 MarlaPKR 1.17-1.35CrPKR 1.85-2.15CrPKR 2.30-2.75Cr9-12 months
1 KanalPKR 2.34-2.70CrPKR 3.70-4.30CrPKR 4.60-5.50Cr12-15 months

Indicative ranges for Etihad Town, Lahore. Your exact figure depends on plot size, covered area, floors and specification, we issue a free itemised BOQ within 48 hours.

B-25 Concrete & Grade 60 Steel

B-25 means a minimum compressive strength of 25 N/mm² (≈3,500 psi) at 28 days. We take cube samples at every structural pour and share the 7-day and 28-day results with you. All reinforcement is Grade 60 (420 MPa) deformed bar with mill certificates kept on file, never sub-standard or recycled steel.

★★★★★

"Cube tests at every pour, results shared with us. Grey structure for our 10 Marla in Phase 4 finished in 10 months, exactly as scheduled."

Naveed Ahmed, Etihad Town Phase 4
FAQ

Grey Structure Construction in Etihad Town Lahore, FAQs

Soil testing, RCC foundation, complete RCC frame, brick masonry, plaster, staircase, roof slab, roof waterproofing, boundary wall with gate pillars, and building-map drawings. It does not include flooring, tiles, paint, kitchen, bathrooms, doors, windows, electrical or plumbing fittings.

Minimum B-25 (3,500 psi) for all structural RCC, with independent cube tests at every major pour, results shared at 7 and 28 days. All steel is Grade 60 deformed bar.

A 10 Marla G+1 in Etihad Town takes about 9-12 months; a 1 Kanal G+1 about 12-15 months. A written milestone schedule is part of every contract.

Yes. Many clients take grey structure only and manage their own finishing or build in phases. There is no obligation to use us for finishing.

Our Services

Other Construction Services in Etihad Town

Coverage

Areas We Build In Across Etihad Town

Building in Etihad Town from Abroad?

We manage complete projects for overseas Pakistanis, map approval, weekly site videos, milestone payments and a dedicated WhatsApp project manager.

  • 3D design approval from UK / UAE / USA / Canada
  • Building-map approval, our team handles everything
  • Weekly Friday site video, without you asking
  • Pay only on verified milestone completion

Get a Free Construction Estimate

Free itemized BOQ within 48 hours. No commitment required.